| |
Building Services Technician Course Content |
| |
|
| |
 |
Learning Outcome: |
| |
|
|
On completion of this program, the Trainee will be able to |
| |
|
|
|
• |
Plan and schedule maintenance work related to buildings ant its premises |
| |
|
|
|
• |
Prepare cost estimates for required maintenance work |
| |
|
|
|
• |
Perform installations, services and repairs of above systems and its equipment |
| |
|
|
|
• |
Communicate effectively with others in organizing, coordinating and monitoring work involved |
| |
|
|
|
• |
Inspects, supervise and follow up work performed by various craftsman |
| |
|
|
|
• |
Responding to emergency situations |
| |
|
|
|
|
| |
 |
Module no |
|
Content |
| |
|
|
|
|
|
Basic Modules |
| |
|
|
01 |
|
• |
Basic Mathematics (Essentials only) |
| |
|
|
02 |
|
• |
Basic Electricity |
| |
|
|
03 |
|
• |
Basic Electronics |
| |
|
|
04 |
|
• |
Basic Mechanics |
| |
|
|
05 |
|
• |
Basic Hydraulics |
| |
|
|
06 |
|
• |
Basic Pneumatics |
| |
|
|
07 |
|
• |
Elements of Telecommunication |
| |
|
|
08 |
|
• |
Basic Welding Principles |
| |
|
|
09 |
|
• |
Assessment of Applications of Basic skills and Knowledge |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
General Modules |
| |
|
|
10 |
|
• |
Read blueprints and symbols and schematics |
| |
|
|
11 |
|
• |
Make measurements |
| |
|
|
12 |
|
• |
Enhance trouble shooting skills |
| |
|
|
13 |
|
• |
Prepare estimates |
| |
|
|
14 |
|
• |
Conserve energy |
| |
|
|
15 |
|
• |
Handle material |
| |
|
|
16 |
|
• |
Maintain safety protections, security and alarm system |
| |
|
|
17 |
|
• |
Control maintenance management |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
Specific Modules |
| |
|
|
18 |
|
• |
Repair/install water supply, sewerage & waste water systems |
| |
|
|
19 |
|
• |
Maintain / install fire hydrants & fire safety sprinkler systems |
| |
|
|
20 |
|
• |
Repair / install chilled water lines & steam pipe systems |
| |
|
|
21 |
|
• |
Maintain central air conditioning and / refrigeration system |
| |
|
|
22 |
|
• |
Perform welding operations, soldering and brazing |
| |
|
|
23 |
|
• |
Repair / construct partitions, ceilings, roofing, flooring and paneling work |
| |
|
|
24 |
|
• |
Co-odinate / supervise civil masonry works |
| |
|
|
25 |
|
• |
Supervise and co-odinate decorative work |
| |
|
|
26 |
|
• |
Carry out electrical installations/maintenance work in electrical systems |
| |
|
|
27 |
|
• |
Repair/install aluminum partitions, aluminum structures and doors and windows |
| |
|
|
28 |
|
• |
Identify and repair/maintain in telecommunication systems |
| |
|
|
|
|
|
|
| |
 |
Entry Qualification
|
: |
G.C.E (O/L) With Pass in Maths & Science
|
| |
|
|
|
|
| |
 |
Course duration |
|
12 Months |
| |
|
|
|
|
|
| |
|
|